PAC Minutes

Western Wake Partners

 

Policy Advisory Committee

Recommendations

 

Monday, September 29, 2008 , 5:00 p.m.

Cary Town Hall , Administration Conference Room #22010

316 N. Academy Street , Cary , North Carolina

www.westernwakepartners.org

 

Apex Mayor Keith Weatherly called the meeting to order at 5:00 p.m.   Committee members attending were Cary Mayor Harold Weinbrecht, Holly Springs Mayor Pro Tem Tim Sack, Apex Town Manager Bruce Raeford, Cary Assistant Town Manager Ben Shivar, Holly Springs Town Manager Carl Dean and Morrisville Town Manager John Whitson.  Committee members absent were Holly Springs Mayor Dick Sears, Town of Morrisville Mayor Jan Faulkner and Cary Town Manager Bill Coleman.  The meeting adjourned at 5:11 p.m.

 

A.    Approval of minutes of the Policy Advisory Committee held on March 12, 2008.

            Mayor Weinbrecht moved to approve the minutes, Mayor Pro Tem Tim Sack provided the second and the committee unanimously approved the motion.

 

B.  Items for Discussion:

1.  Consultant Selection for Western Wake Biosolids Drying and Energy Recovery Facility (PAC09-25)

Mayor Weinbrecht moved to approve entering into a design services contract with Brown and Caldwell in the amount of $830,000 for engineering design of a biosolids drying and energy recovery facility as a bid alternate to the current design.  Town Manager John Whitson provided the second, and the committee unanimously approved the motion.

 

2.  Selection of Power Supplier for Beaver Creek Pump Station (PAC09-26)

Mayor Weinbrecht moved to approve Apex as the electrical power vendor for the Beaver Creek Pump Station and authorized the Lead Agency to proceed with execution of a comprehensive power services agreement with Apex for both the Western Wake Water Reclamation Facility and the Beaver Creek Pump Station.  Town Manager John Whitson provided the second, and the committee unanimously approved the motion.

 

3.  Waterline Extension to Beaver Creek Pump Station (PAC09-27)

Mayor Weinbrecht moved to approve Option #2: the extension of potable water from Apex to the Beaver Creek Pump Station, contingent upon Apex’s ability to waive capacity/acreage fees, provide the oversize reimbursement allowance as specified herein and acquire any necessary easements for the water line; and authorize the Lead Agency to execute any required oversize reimbursement agreements with Apex on behalf of the Western Wake Partners.  Town Manager John Whitson provided the second, and the committee unanimously approved the motion.

 

C.  Other Business:  none

 

D.  Closed Session N/A

 

E.  Next Meeting :  TBA


Western Wake Partners

 

Report to the Policy Advisory Committee (PAC09-25)

 

 

Date:                  September 29, 2008

To:                      Western Wake Partners

From:                 Tim Bailey, P.E., Director of Engineering, Town of Cary

Prepared by:      Jamie Revels, P.E., Senior Engineer, Town of Cary

Subject:              Consultant Selection for Design of Western Wake Biosolids Drying and Energy Recovery Facility        

 

 

Background:

Early in preliminary engineering, biosolids disposal strategies such as offsite composting, landfilling and land application were all evaluated for the Western Wake Water Reclamation Facility, (WWWRF).  As a result of continued growth and development in Wake County , landfilling and land application were not deemed feasible for the Western Wake Facility.  There were several reasons that contributed to the dismissal of landfilling and land application including long trucking distances, securing the required 1,500 acres of farmland to support land application, the immense volume of long term aerated tank capacity required for seasonal storage and the relative short term use of landfill and land application sites.  Another major factor considered with respect to land application is the phosphorus limiting nature of soils in Wake County and outlying areas.  Most Wake County soils already have high phosphorus levels and the use of phosphorus as a limiting nutrient for land application has the potential to significantly drive up the acreage of land required to sustain a land application program. 

 

At the completion of preliminary engineering, offsite composting was selected as the preferred biosolids disposal option.  Offsite composting was believed to require the lowest capital cost, while requiring less aerated storage volume than landfilling or land application.  When compared with landfilling and land application, offsite composting provided a more permanent solution with a higher degree of security from adverse weather events.  Other onsite Class A options such as heat drying, incineration, etc. were not considered during the preliminary engineering phase. 

 

 

Value Engineering Review of Biosolids Management Strategy

The Arcadis/CH2M Hill design team proceeded with the design of aerated holding tanks, gravity belt thickeners and dewatering equipment as envisioned during preliminary engineering to produce a dewatered cake biosolids material that would be hauled offsite to a merchant composting facility.  In keeping with this design concept, the aerated holding tanks were designed for a storage volume of 20-days, which was deemed sufficient to provide both onsite storage and partially stabilize the sludge in advance of composting. 

 

In April 2007, a team composed of engineers from HDR conducted a value engineering review of the project at 50% design.  The VE team focused on biosolids handling as a potential area to recognize savings.  The VE team noted in their report that the suggested 20-day aerated holding tanks would require approximately 800-HP, which for an 18-MGD facility would incur substantial power costs just to maintain aeration.  As an option, the VE team proposed modifications to the biosolids stabilization approach focused on reducing aeration power requirements.  The anaerobic digesters proposed by the Value Engineering team did not require massive aeration power, but rather a modest 150-HP for mixing, representing approximately $300K in annualized operational cost savings at full capacity.  While modest in power requirements, the anaerobic digesters presented the design team with other complex problems such as more intense odor potential, increased capital cost, multifaceted operating strategy and the potential for an emergency or failure related to holding the explosive methane gas generated during anaerobic digestion.  Despite the savings in operating costs, there were a number of other potential process related problems related to nutrient recycles and chemical additions that contributed to a higher degree of complexity, not only with the biosolids management strategy, but also with the overall treatment process.  In the final evaluation, both aerobic sludge holding and anaerobic digestion stabilization processes were found to produce a substantial volume of dewatered cake to haul away via offsite composting.  The partially stabilized sludge created under either process would be a highly regulated product subject to additional pathogen and vector attraction reduction procedures and/or intensely restrictive regulations for disposal.  In conclusion, it was determined that the most beneficial means to truly improve flexibility in biosolids management was to develop a Class A product and reduce overall sludge volume to the maximum extent possible. 

 

 

Dryer Option      

Recognizing there were benefits in both prior approaches, Town staff continued to evaluate alternate process technologies that would maintain the current secondary treatment process, reduce aerated storage volume and associated power requirements, and provide the maximum possible biosolids disposal with a Class A product.  As heat drying technologies for municipal biosolids have evolved during the last several years to incorporate belt drying, heat drying has also been targeted to much smaller facilities on a more cost competitive basis than ever before.  As a result, a quick preliminary evaluation was compiled to determine if integrating heat drying into the biosolids disposal process was feasible.  The preliminary approach included heat drying to reduce sludge volume and provide a Class A product, while at the same time significantly reducing aerated holding tank volume from 20-days to 5-days, thereby significantly reducing aeration power consumption as suggested by the VE team and potentially offsetting energy costs required for drying, see Figure 1.

 

 

 

 

 

 

 

 

Figure 1:  Process Schematic of Dryer Option

 

2

 

The feasibility of the dryer option was verified and the process was studied in detail by Arcadis and CH2M Hill.

 

Dryer Technologies Investigation

During detailed review of the various dryer technologies, several drying methods were investigated including rotary drum dryers, paddle dryers and belt dryers.  While all of the drying technologies possess the capability to adequately dry municipal biosolids in compliance with Class A standards, the belt dryer design was found to best meet the needs of the Western Wake Partners.  The belt dryer provides the following advantages over competing dryer technologies: (1) no product recycles are required, (2) redundancy is provided in a 2 train drying approach, (3) modular design aids in constructability and simplifies future expansion projects, (4) EPA Class A standards can be met without additional unit processing, (5) stainless steel mesh belt design does not require routine maintenance, (6) drying system can be operated with less personnel and oversight, (7) system can be operated exclusively from the SCADA system, (8) lower drying temperatures, 350oF or less, allow more options for disposing of exhaust gases (9) high level safety controls are provided to prevent fires (9) reduced product handling minimizes potential for dust problems and (10) the belt drying equipment is integrally supported on a standard concrete floor without the need for additional concrete support structure.

 

Energy Recovery System

A secondary benefit of the belt dryer is that it can be coupled to operate with an energy recovery system provided by the same manufacturer.  The energy recovery system provides a furnace that combusts dried sludge and captures the heat to reuse in the drying process.  The energy recovery system takes advantage of the energy content in the dried sludge to provide approximately 80% to 100% of the thermal energy required for drying.  At 2020 projected sludge processing capacity, approximately 980 MMBtu’s would be required per week.  At a market cost of $12/MMBtu, the natural gas cost of drying without energy recovery translates into approximately $11,760 per week.  The energy recovery system would allow the natural gas utilization to be reduced by 80% or greater through combusting the dry sludge as a fuel source.  This would translate into a weekly savings of $9,400, or greater as natural gas prices continue to escalate.  On a yearly basis, this translates into an annualized operating cost savings of $500K.  As a further benefit, the heat balance between the dryer and energy recovery system could be optimized along with operating times and loading conditions to offset nearly 100% of the heat energy demand.  In conclusion, the energy recovery system not only decreases natural gas use by 80% or more, but also contributes to a further reduction in final biosolids volume well beyond the substantial volume reduction experienced by drying alone.

 

Long Term Benefits of Dryer and Energy Recover System

The four principle benefits of the dryer/ERS system for biosolids management are volume reduction, producing a Class A product, maintaining independent control of biosolids management and conserving drying energy by using the dried sludge product as a fuel source. 

 

Control Our Own Destiny:  The dryer/ERS system retains nearly all operations, processing and scheduling tasks for biosolids management with the Western Wake Partners.  By maintaining control of biosolids processing onsite at the WWWRF, the Western Wake Partners would be isolated from potential interruptions in service and/or other changes in operating conditions caused by dependence on private sector contractors.  For instance, the merchant composting option proposed under the original design would require total and complete reliance on outside contractors to provide biosolids disposal needs for the Western Wake facility.  If the composting company were sold, bankrupt, or shut down due to permitting problems or natural disasters; the Western Wake Partners would be faced with either building massive capital facilities on short notice or entering into a series of short term agreements with private firms to provide biosolids disposal.  Since there is only one composting firm in close proximity to the West Plant, it would be highly likely that any interruption in service would require a substantial increase in short term operating costs to continue biosolids disposal.  Further, due to the size and magnitude of the Western Wake Facility, no single private sector composting firm would likely be able to cover the capacity required by the Western Wake Facility in the case of an emergency shut down of the contract composting firm.  This would likely result in the short term solicitation of several outside composting firms at highly variable cost ranges dependent upon factors such as available capacity, fuel prices and trucking distance. 

 

Conversely, the dryer/ERS system places complete operational control with the Western Wake Partners combined with producing a Class A product that achieves the maximum possible volume reduction.  This strategy allows the most flexibility and options for ultimate disposal of biosolids including offsite sale of a Class A soil amendment that could be applied to agriculture or forestry resources.  Alternatively, the dry sludge could be combusted and utilized as a renewable fuel source for drying, thereby reducing facility dependence on fossil fuels.

 

Volume Reduction:  As noted by Figure 1, the volume reduction produced by the dryer/ERS system is unparalleled among the other biosolids disposal strategies considered for the Western Wake WRF.  The benefit of volume reduction is to reduce storage and processing costs.  For instance, under the original plan, 20-day aerated storage must be provided to stabilize the sludge in advance of composting.  This requires capital infrastructure to store the sludge and higher operating costs to aerate the sludge.  Additionally, when the partially stabilized sludge is dewatered and hauled offsite for composting, the volume is actually increased by adding wood chips, sawdust, etc. to provide a beneficially viable product for public use. 

 

Alternatively, the ash product generated after the drying/ERS process will be reduced by more than 90% from its original volume as a dewatered cake, a form solid material composed of 80% water.  This massive volume reduction to a dry ash product allows for storage in relatively small 2.5 cubic yard reusable storage bags that can be stacked away for weeks until the ash is ultimately sent to a landfill site or other beneficial reuse such as brick or concrete production. Without the dryer/ERS system, the Western Wake Partners would be responsible for hauling the full volume of dewatered cake to an outside composting firm for further treatment and disposal. 

 

 Figure 2: Volume Reduction with Drying and Energy Recovery

4  

 

Class A Product:  The EPA has established different classifications for biosolids treatment that regulate how the biosolids can be disposed.  A tremendous benefit of a drying process is that it meets the requirements for a Class A product, which can be disposed in any number of ways with minimum regulatory requirements.  The Class A certification assures the dried sludge product has been proven safe for both pathogen reduction and vector attraction reduction.  A further benefit of the energy recovery furnace is that by combusting the dry sludge up to 1,500 degrees Fahrenheit, there is no opportunity for pathogen regrowth or vector attraction.  Class A biosolids can be applied to places such as parks and golf courses without site or use restrictions. 

 

Conservation of Energy:  The dryer/ERS system successfully conserves energy by creating a valuable commodity in the form of dried biosolids.  The dried biosolids have a fuel content that when combusted can release a substantial quantity of energy.  The energy released from the sludge in the ERS phase of the system can be harnessed to heat the drying process.  The utilization of the ERS phase of the system places a commodity value on the dried sludge since it offsets up to 80% or more of the natural gas required for the drying process.  As an added benefit, the reduced stabilization and storage time of 5-days contributes to an increase in the fuel value of the sludge.  As stated earlier, the natural gas cost savings at 2020 plant capacity with the dryer/ERS system would most likely top $500,000 per year over the dryer option without an ERS.  Through utilizing the dried sludge as a fuel source, the Western Wake Partners would be buffered against continued increases in natural gas prices.  As an additional consideration, if natural gas prices continue to exceed anticipated price increases, dry sludge pellets from the South Cary WRF could be combusted at the West Plant to further reduce natural gas consumption by fueling dryer operations.

 

Biosolids Drying Facility Capital Costs

Integrating a dryer and energy recovery system into the current design affords the Western Wake Partners a unique opportunity to streamline the capital facilities required for the biosolids facility.  As an example, the dryer and energy recovery system, which operates more on a continuous basis as opposed to shift basis, provides an opportunity to substantially reduce aerated holding volume required for sludge stabilization.  Several other equipment operations included in the original design could be downsized or minimized due to the redundancy provided by the dryer and energy recovery system.  Examples are elevated truck loading, high capacity dewatering, additional polymer makeup and feed systems, etc.  Based on current projections, the biosolids drying facility capital costs would be reasonably competitive with the current design utilizing the composting option.   

 

Life Cycle Costs

Prior 20-year present worth evaluations have demonstrated that the belt dryer with ERS option provides a lower life cycle cost than the current design, which utilizes 20-day storage and massive 800-HP blowers to partially stabilize sludge in advance of dewatering and offsite composting.  The magnitude of the capital costs required for extended sludge storage and the increased operating costs for aeration contribute to the lower present worth analysis for the dryer/ERS option.  In addition to aeration power, several operating cost factors were considered in the prior present worth analysis including dewatering power, natural gas, composting fees, dewatering polymer, chemical requirements and maintenance.  Operations labor was determined to be equal and offsetting among the composting and drying options and wasn’t considered as a determining factor in the present worth analysis.

 

Present worth cost determinations will be computed when the final process schematic has been determined and will likely show a greater 20-year present worth advantage in favor of drying and energy recovery over the existing design with aerated holding and composting.

 

Why Consider Drying Now

Aside from the numerous long term benefits of the dryer/ERS facility, there are also benefits with reducing overall capital construction costs for a drying facility that can be derived from building this facility integral to original plant construction. 

 

            Integrated Design Reduces Overall Facility Costs:

Sludge that will be combusted doesn’t require aerobic stabilization and therefore, aerated storage volume under the dryer/ERS plan can potentially be eliminated as opposed to providing 20-days of aerated storage and stabilization required under the composting option.  If the dryer facility were constructed separately and not integrated into the current site plan, the total cost of adding a separate drying facility with an energy recovery system would total approximately $16M.  Conversely, integrating the dryer and energy recovery system into the current design provides an opportunity to construct the drying facility for nearly the same capital cost as the original design by not overbuilding aerated storage tanks that would not be necessary for a drying and energy recovery facility. 

           

            Reduced Long Term Aeration Operating Costs:

One of the key VE suggestions to reduce operating cost was reducing power requirements for aerated sludge holding.  Under the original design, aerated sludge holding would require approximately 800-HP to operate at 20-days of storage required for the composting option.  This translates into roughly $1,000 per day in power consumption at full capacity.  The suggested drying and energy recovery facility with limited aerated holding would greatly reduce routine operations costs associated with aeration. 

 

Reduced Size of Solids Handling Building :

The original design includes a larger solids handling building to house sludge thickening equipment, dewatering equipment, blowers, chemical storage, polymer storage, feed pumps, lab equipment, etc.  Integrating the dryer/ERS system into the current site layout would actually serve to reduce the size and footprint of the solids handling building because the dryer/ERS option doesn’t require the massive blower room required under the original design concept.  In the final evaluation, integrating the dryer/ERS facility into the current design assures that long term operational capacity can be met by constructing one comprehensive solids handling building, as opposed to constructing a separate building to house a dryer in the future.

 

Residual Drying Capacity Available to Western Wake Partners:

A final benefit of integrating the dryer/ERS into the current design is that it would provide some supplemental biosolids processing capacity during the early years of operation that could be utilized by the Western Wake Partners.  This supplemental capacity could potentially be provided to the Western Wake Partners at a lower operating cost than their current biosolids disposal options.  If the Western Wake Partners elect not to utilize any of the reserve capacity at the Western Wake Facility, it could still provide an outlet to support the Partners during emergency shut downs or suspensions of their existing contract arrangements for biosolids disposal.

 

Suggested Approach

In order to provide a true competitive cost evaluation backed by actual bid data, the suggested approach is to complete the original biosolids facility design supplemented by offsite composting and bid this facility design against the preferred dryer/ERS facility.  This approach provides a more competition driven incentive to the vendors included under both options.  While it’s already determined that a drying facility will be higher in initial capital cost than the original design option, the actual bid data could be utilized to run a secondary present worth evaluation at the time bids are received to verify which system best meets the long term expectations of the Western Wake Partners.  The original biosolids facility design based on offsite composting is nearly complete and only minimal engineering design effort will be required to bring this design contract to bid phase completion.  The dryer/ERS facility design has not been initiated at this time.

 

Consultant Selection Process

A Request for Proposals was advertised on July 28, 2008 and proposals were received on August 22, 2008 from two firms: Brown & Caldwell and Bolten & Menk.  After a thorough review process, a selection committee composed of staff members from the Project Partners unanimously agreed to recommend that Brown & Caldwell be awarded the design services contract.  Factors that contributed to the selection included B&C’s process schematic that substantially reduces aerated holding, their ability to balance drying and energy recovery to achieve higher energy efficiency and their focus on reducing nuisance conditions such as noise, odor, light spillover, etc.  Both firms submitted excellent proposals and conducted exceptional interviews with the selection committee.  In the final review, the B&C team provided the Western Wake Partners with the best opportunity to reduce expenses associated with constructing and operating the biosolids facility.

 

The engineering fee estimates submitted by both firms are as follows:

 

                        Brown and Caldwell:            $830,000

                        Bolten and Menk:       $848,000

 

Requested Action:

Staff recommends PAC approval to enter into a design services contract with Brown and Caldwell in the amount of $830,000 for engineering design of a biosolids drying and energy recovery facility as a bid alternate to the current design.  The bid alternate approach for the drying and energy recovery facility would provide an onsite biosolids management option that would be bid against the original design, which is dependent upon offsite composting by a private company.  The two competing biosolids facility design plans would be evaluated using competitive bids combined with consideration of life cycle operations and maintenance costs, including offsite composting service fees.  This suggested approach provides market driven incentives to both dryer/ERS equipment vendors and private composting firms to minimize costs and compete for award of the biosolids facility contract. 

 


Western Wake Partners

 

Report to the Policy Advisory Committee (PAC09-26)

 

Date:                  September 29, 2008

To:                      Western Wake Partners

From:                 Tim Bailey, P.E., Director of Engineering, Town of Cary

Prepared by:      Jamie Revels, P.E., Senior Engineer, Town of Cary

Subject:              Selection of Power Vendor for Beaver Creek Pump Station

 

Background:

In February 2007, the Town of Apex was selected as the electric power vendor for the Western Wake Water Reclamation Facility.  Proposals were received from Progress Energy and the Town of Apex .  After a thorough review process, the Town of Apex was selected.  Factors considered in the selection included the following: Apex’s willingness to install redundant transformers onsite, their ability to respond quickly to power outages, their support as a wastewater system operator, their emergency operations agreements with seventy-three other municipal electric utilities in NC, and their offering of cost option plans to reduce peak demand costs.

 

Following on the original proposal, Apex submitted a similar proposal for the extension of power to the Beaver Creek Pump Station.  The proposal submitted by Apex follows on the same format and benefits that contributed to their selection as the power vendor for the Western Wake Water Reclamation Facility. 

 

Hazen and Sawyer analyzed the proposal from the Town of Apex to provide electric service to the Beaver Creek Pump Station.  An overview of the proposal and utility service recommendations are summarized below.

 

Proposed Facilities

The Town of Apex is proposing to supply electric power to the Beaver Creek Pump Station from a new substation (Southwest Apex Substation).  This substation does not exist at the time of this report, however, it is anticipated to be in service by 2009.  A new 23kV feeder will be installed from this new substation to the pump station site via approximately 1.5 miles of overhead conductors.  The Town of Apex is proposing to deliver electric power to the pump station from two 1500KVA 23kV/480-277VAC, wye-wye pad mounted transformers on the pump station site in accordance with the project construction drawings.  These transformers will be furnished and installed by the Town of Apex .  Both transformers will be supplied from the single 23kV service from the anticipated Southwest Apex Substation.  The Town of Apex stated in their proposal that they will monitor the pump station load and will increase the transformer capacity as needed to ensure the pump station can operate at full capacity from a single utility transformer.  The Town of Apex will own and maintain both transformers and the 23kV primary conductors and terminations.  The Western Wake Partners will be responsible for the installation and maintenance of the secondary conductors and terminations. 

 

To increase pump station reliability, the pump station design requires two redundant utility transformers.  The Town of Apex has agreed to install one of the utility transformers free of charge.  The installation of the second transformer will cost the Western Wake Partners a one time fee of approximately $30,000 to purchase the transformer.

 

The Town of Apex ’s proposal stated that the contracted delivery voltage will be within ±10% of 480VAC.  The proposal also stated that it is unlikely the voltage will vary beyond ±5% of 480VAC. 

 

Metering and Billing Rates

Since the Town of Apex will meter the energy and demand usage on the secondary side of the utility transformers, the Western Wake Partners will not pay for the transformer energy losses.  In addition, the metered energy and demand usages will be identical whether the power consumption is metered through two transformers or one.   

 

The Town of Apex ’s proposal included three (3) billing rate alternatives;

 

  1. Large General Service (LGS) – This service charges a single energy charge and demand charge during each billing period.  The time of day at which the maximum demand occurs does not have any impact on the demand charge.

 

  1. Large General Service Time of Use (LGS-TOU) – This service is similar to the LGS service except that there are different demand charges depending on whether the maximum billing period demand falls during “on-peak” hours or “off-peak” hours.  Since the demand charges are less during “off-peak” hours, there is the potential to reduce the demand charges if the user can defer their plant operations so that their maximum power demand occurs during “off-peak” hours.

 

  1. Large General Service Coincident Peak (LGS-CP) – For this service, the user’s demand charges are measured during the 60 minute interval when the Town of Apex’s demand charges are being measured by the North Carolina Municipal Power Agency (NCEMPA) during each billing period.  This rate schedule can be very beneficial for users who can significantly reduce their load during the time when the Town of Apex ’s demand charges are being measured by NCEMPA.  Standby power generators can be used during this period to eliminate the demand charges during this time; however, the Town of Apex will require the standby power generation system to be in compliance with the Public Utility Regulatory Policies Act (PURPA).

 

Billing Rate Analysis

The energy usage and demand rates for each billing rate alternative offered in the proposal were analyzed.  Agreements for power would be structured on a recurring 4-year basis.  In order to estimate projected average and peak flows at the Beaver Creek Pump Station during the first term, 2014 projected flows were used as follows to determine monthly billing: Average Daily Flow of 9.58-MGD and Peak Flow of 29.7-MGD).  Based on first term flow projections, it is estimated that the average monthly energy usage and the average monthly demand will be approximately 255,000 kilowatt-hours and 700kW respectively.  The maximum utility bill for each billing period is shown in Table 1.  These calculations assume the pump station maximum demand occurs during “on-peak” periods for the LGS-TOU billing rate and during the time when the Town of Apex ’s demand charges are being measured by NCEMPA for the LGS-CP billing rate. 

 

The LGS-CP billing rate is the least expensive of the three alternatives primarily due to the lower energy charge.  This billing estimate for the LGS-CP rate does not include any peak shaving operations to reduce the demand charges.  As stated above, the Western Wake Partners can not take advantage of using the standby power generators to reduce the demand charges by peak shaving unless the standby power generation system is PURPA compliant.  In order to be PURPA compliant, the heat from standby power generators must be utilized so that the overall generator efficiency meets PURPA standards.  Since there is no effective use for the heat generated by the generators at the Beaver Creek Pump Station, it is unlikely the standby power generation system at the Beaver Creek Pump Station can meet the PURPA standards.  Therefore, the standby generators can not be used for peak shaving unless the Town of Apex changes their PURPA compliance requirements.

 

Conclusions

The LGS-CP is the recommended billing rate for this pump station.  It should be noted that available billing rates should be re-analyzed based on actual utility data after the pump station is in operation.

 

It is also recommended that the electric utility contract with the Town of Apex include delivery voltage regulation of ±5% of 480VAC.  Any voltage variation beyond ±5% of 480VAC will cause under/over voltage nuisance tripping of the pump station variable frequency drives.

 

The proposal submitted by the Town of Apex has demonstrated that the benefits evaluated in the initial selection have also been incorporated with the current proposal for the Beaver Creek Pump Station.  To briefly recount, those benefits are as follows:

 

1)      Apex will install a redundant transformer onsite.

2)      Apex maintains the ability to respond quickly to power outages.

3)      Apex is a wastewater system operator and understands the level of response required for emergency power outages.

4)      Apex maintains emergency operations agreements with seventy-three other municipal electric utilities in NC to reinforce their response capability.

5)      Apex has provided cost option plans that could reduce long term operating costs.

6)      Apex had lower life cycle power costs than its competitor in the previous evaluation for the Western Wake Water Reclamation Facility.

7)      Apex’s proposed future cost increases are less than its competitors.

 

Requested Action   It is recommended that the Policy Advisory Committee select Apex as the electrical power vendor for the Beaver Creek Pump Station.  It is further recommended that the PAC authorize the Lead Agency to proceed with execution of a comprehensive power services agreement with Apex for both the Western Wake Water Reclamation Facility and the Beaver Creek Pump Station.


Table 1 – Electric Billing Estimates

 

Large General Service (LGS)

 

 

Facility Charge per Month

$21.00

Energy Charge per kWh

$0.0660

Demand per kW

$8.55

 

 

Facility Charge

$21.00

Energy Charge

$16,853.76

Demand Charge

$5,985.00

3% NC Sales Tax

$685.79

Billing Period Total

$23,545.55

 

 

Large General Service Time Of Use (LGS-TOU)

 

 

Facility Charge per Month

$31.00

Energy Charge per kWh

$0.0614

Demand-On Peak per kW

$10.26

 

 

Facility Charge

$31.00

Energy Charge

$15,679.10

Demand Charge

$7,182.00

3% NC Sales Tax

$686.76

Billing Period Total

$23,578.87

 

 

Large Service General Coincident Billing (LGS-CP)

 

 

Facility Charge per Month

$76.00

Energy Charge per kWh

$0.0444

Demand-On Peak per kW

$14.00

 

 

Facility Charge

$76.00

Energy Charge

$11,337.98

Demand Charge

$9,800.00

3% NC Sales Tax

$636.42

Billing Period Total

$21,850.40

 

 


Western Wake Partners

 

Report to the Policy Advisory Committee (PAC09-27)

 

Date:                  September 29, 2008

To:                      Western Wake Partners

From:                 Tim Bailey, P.E., Director of Engineering,Town of Cary

Prepared by:      Jamie Revels, P.E., Senior Engineer, Town of Cary

Subject:              Apex Water Main Extension to Beaver Creek Pump Station

 

Background:

The Beaver Creek Pump Station, which has been designed for a firm capacity of 40-MGD at Phase 1 operating conditions, will have a substantial potable water demand to maintain the proposed odor control and chemical dilution systems.  At present, potable water service from the Town of Apex is not available at the proposed Beaver Creek Pump Station site.  Two options have been investigated to provide the necessary potable water demand for the pump station.

 

Option #1: Construct Well and Hydropneumatic Tank

The first option for providing potable water at the Beaver Creek Pump Station is constructing a well.  As a result of historically low well water yields in the geographic area where the Beaver Creek Pump Station will be located, peak water demand cannot be sustained in a manner to operate the pump station reliably.  Therefore, a sizable hydropneumatic tank would be required to store potable water for peak demand periods.  Even with a large hydropneumatic tank, well yields in the area where the Beaver Creek Pump Station will be located are subject to fluctuations.  The estimated cost of the well, hydropneumatic tank and supporting systems has been estimated at approximately $87K.  Additionally, the well system would not support the installation of fire sprinkler systems required for the chemical storage building.  As a result, the chemical feed for odor control would be limited to Bioxide only, which is a non-corrosive, non hazardous chemical.  Bioxide, a proprietary chemical formulation consisting of calcium nitrate, is used for oxidizing reduced sulfur compounds that contribute to odor in raw wastewater conveyance systems.  As a proprietary formulation, Bioxide costs more than non-proprietary chemicals such as ferrous sulfate or ferric chloride.  Additionally, the use of Bioxide has the potential of adding supplemental nitrogen to the wastewater that must be removed in the treatment process.  The ability to retain flexibility in utilizing multiple chemical formulations for odor control would prove beneficial in reducing long term operation costs.  The only way to assure that multiple chemicals can be used in compliance with all hazardous environment regulations is to provide a fire sprinkler system connected to a reliable water supply.  The well and hydropneumatic tank option would not support a fire sprinkler system.

 

Option #2: Construct Water Line Extension from Apex

The second option for providing potable water at the Beaver Creek Pump Station is constructing a municipal water line extension from Apex.  The Apex water main extension would include approximately 5,700-linear feet of potable water pipeline construction along Olive Chapel Road .  A potable water extension from Apex would meet all peak water demands at the Beaver Creek Pump Station site and negate the need for a hydropneumatic tank.  The Apex municipal water system would support all necessary fire sprinkler systems and thereby allow the use of multiple chemicals to help lower long term operating costs.  The Town of Apex has reviewed the proposed water line extension and agreed to support waiving all acreage and capacity fees associated with providing potable water to the Beaver Creek Pump Station.  The Apex Water System Master Plan requires a 12-inch diameter water trunk line along Olive Chapel Road , which is larger than required to meet the water demand for the Beaver Creek Pump Station.  As a result, Apex has supported paying the cost difference of approximately $100K through their offsite oversize reimbursement program.  Additionally, Apex has agreed to acquire the easements for the water main in conjunction with acquiring easements for the power line to the Beaver Creek Pump Station.  Compensatory costs required for water line easements would be borne by the Western Wake Partners and an allowance has been included in the cost table below for easement costs.  In summary, the estimated cost to the Western Wake Partners for the water line extension is approximately $315K for construction, $55K for design services and $100K for easement acquisition for a total estimated cost of $470K.  Oversizing costs are currently estimated at $100K, which would be reimbursed by Apex, upon executing an oversize reimbursement agreement.  

 

Cost Tabulation:

Option 1 and option 2 costs are outlined below.  Assuming the oversize reimbursement and acreage/capacity fee waivers are approved by Apex, the estimated cost increase will be approximately $483K to add the potable water main. 

 

            Option #1: Well and Hydropneumatic Tank           $ 87K

 

Option #2: Waterline Extension from Apex

Construction                          $315K

                        Design Services                      $  55K

Oversize Allowance               $100K

                        Easement Acquisition Cost    $100K

                                    Total                                        $570K

 

Table 1: Cost Per Project Partner to Extend Apex Water Main to Beaver Creek Pump Station

 

Apex

Cary

Morrisville

Total

Cost Share Percentages, BCPS

21.3%

69.0%

9.7%

100%

Base Water Main Construction

$67,095.00

$217,350.00

$30,555.00

$315,000.00

Design Services

$11,715.00

$37,950.00

$5,335.00

$55,000.00

Oversize Allowance

$100,000.00

$0.00

$0.00

$100,000.00

Easement Costs

$21,300.00

$69,000.00

$9,700.00

$100,000.00

Totals

$200,110.00

$324,300.00

$45,590.00

$570,000.00

 

The potable water main extension, although more costly than the well and tank option provides several advantages in comparison.

 

1)      Safe and reliable water source for fire sprinkler systems and eye wash stations.

2)      Allows flexibility in selection of chemical feeds.

3)      Prevents the installation of additional water storage tanks.

4)      Assures reliable supplement of nutrient feeds for biofiltration odor control.

 

Requested Action   It is recommended that the Policy Advisory Committee approve the extension of potable water from Apex to the Beaver Creek Pump Station, contingent upon Apex’s ability to waive capacity/acreage fees, provide the oversize reimbursement allowance as specified herein and acquire any necessary easements for the water line.  It is further recommended that the PAC authorize the Lead Agency to execute any required oversize reimbursement agreements with Apex on behalf of the Western Wake Partners.

 